A software project moves through discovery, design, build, verification, release and support, and most overruns trace back to a handover between those stages that nobody owned. This guide describes each stage, the decision it ends with, and what a buyer should expect to see before it is allowed to close.

Start your project

01

Why stages matter more than methods

Teams argue about agile versus waterfall, but buyers are rarely hurt by the label. They are hurt when nobody can say what has been decided, what is still open and who must decide it next. A good process makes those three things visible at all times, whatever the ceremonies are called.

The six stages in order

01

Discovery

Turns a goal into a testable scope: users, constraints, risks, and a first view of cost and sequence. Ends with a signed-off outline of what will and will not be built.

02

Design

Produces the interaction design and the technical design together, so that nothing is drawn that cannot be built within the constraints found earlier.

03

Build

Delivers working software in short increments, each demonstrated to the people who will use it, with automated tests written alongside the code.

04

Verification

Confirms the product meets written acceptance criteria, including security, performance and accessibility checks agreed at the start.

05

Release

Moves the product into use with a rehearsed deployment, a rollback plan and a named owner on both sides.

06

Support

Covers fixes, monitoring and planned improvement after launch, under terms agreed before the build begins.

03

What should exist before each stage closes

  • Discovery: a written scope, a prioritised list of outcomes, a risk register and an agreed way to handle change.
  • Design: approved flows, a data model, an architecture diagram and a list of external dependencies.
  • Build: a working increment every cycle, a visible backlog and test results that anyone can read.
  • Verification: a traceable list of acceptance criteria with a pass or fail against each.
  • Release: a deployment runbook, a rollback procedure and a communications plan for users.
  • Support: an agreed contact route, a defined way to classify issues and a handover of documentation.
Have a requirement in mind?

Share the outcome you need and Renvric will recommend the smallest useful next step.

04

Where projects usually go wrong

The common failures are quiet ones. Acceptance criteria are never written, so completion becomes a matter of opinion. A third-party integration is assumed to be simple until the build reveals an undocumented limit. A decision-maker is absent from demonstrations, and a change they would have rejected is discovered at launch.

Each is cheaper to prevent than to repair, which is why Renvric favours short written decisions over long meetings.

Roles across the stages

01

Client

Owns the outcomes, supplies a decision-maker with authority, and responds to questions within the agreed time.

02

Renvric

Owns delivery of the agreed scope, reports progress honestly and raises risks as soon as they are known.

03

Shared

Change control, acceptance, and the choice of when a stage is complete.

06

A worked example

Consider a logistics firm replacing a spreadsheet-based dispatch process. Discovery might establish that three depots work differently, so the first release serves one depot only. Design confirms the route data comes from a third-party service with rate limits. Build proceeds in fortnightly increments, each shown to a dispatcher. Verification includes a rehearsal with real data, and release is timed for a quiet week.

Related areas to explore: Business Process Automation, Intelligent process automation and Document process automation.

Common questions

It is for buyers and sponsors of software projects who want to know what a sensible process looks like without becoming engineers. Technical leads can use it as a checklist when comparing the process described by different suppliers against what they expect to see.

A statement of the outcome you want, who will use the product, any fixed dates or regulations, and the systems it must work with. A rough budget range is useful. Missing detail is normal; surfacing it is the purpose of discovery.

The stages stay, but the artefacts shrink. A small project may have a scope of a couple of paragraphs, a single design review and a short acceptance list. What should never be dropped is written acceptance criteria and a named person who can say yes.

Neither label is the point. Discovery and verification are planned up front, while build proceeds in short increments with working software shown regularly. The test of any process is whether you can see progress, decisions and risks at any moment without asking for a special report.

Write to info@renvric.com with a short description of your project and the stage you are at. A delivery lead can say what artefacts you should expect, or arrange a consultation to review a proposal you have received from another supplier.

Next step

Applying this to your project

01

If you already have a process, use the stages as a checklist and note where an artefact is missing. If you do not, a short discovery is usually the cheapest way to produce the first three.

Start Your Project

Start your project

Fields marked * are required. An incomplete brief is fine: say what is still uncertain.

Preferred contact method *
Include the currency if you know it.
The outcome you need, the current situation, known constraints and timing.
NDA requirement
RFP or brief: PDF, Word, Excel, PowerPoint or text, up to 5 MB.